AC2MTDC - Conversion of AC to DC overhead lines enabling environmentally efficient multi-terminal DC grid
Forthcoming · Croatia, France, Slovenia, Germany, Switzerland, Italy, Portugal
Source: EU Funding & Tenders Portal
AC2MTDC delivers a validated, TSO-ready engineering package and primary equipment enabling the conversion of existing 220/400 kV AC overhead transmission lines to HVDC operation at voltage levels up to 525 kV DC, providing an affordable, environmentally efficient pathway for building the terrestrial segments of future multi-terminal DC grids in Europe. The project pursues four specific objectives:
- Status
- Prospective
- Sector
- Commercial
- Location
- Croatia, France, Slovenia, Germany, Switzerland, Italy, Portugal
- Updated
- 19 Nov 2026
- Source
- EU Funding & Tenders Portal
ConstructChat
Ask ConstructChat about AC2MTDC - Conversion of AC to DC overhead lines enabling environmentally efficient multi-terminal DC grid
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | forthcoming |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | AC2MTDC delivers a validated, TSO-ready engineering package and primary equipment enabling the conversion of existing 220/400 kV AC overhead transmission lines to HVDC operation at voltage levels up to 525 kV DC, providing an affordable, environmentally efficient pathway for building the terrestrial segments of future multi-terminal DC grids in Europe. The project pursues four specific objectives: (1) a decision-support toolkit combining techno-economic cost-benefit analysis aligned with the ENTSO-E 4th CBA Guideline, environmental impact quantification, and multi-fidelity grid security assessment for systematic evaluation of conversion candidates (2) the first portable DC pollution measurement stations and corridor-scale pollution mapping methodology, producing empirical datasets for reliable DC insulator design (3) a complete insulation coordination and overvoltage protection framework, including the first DC-rated Externally Gapped Line Arrester prototype and a Permanent Insulation Monitoring system for dedicated metallic return conductors (4) harmonised European standards and grid code proposals ensuring cross-border interoperability. These objectives are achieved through an integrated methodology combining system-level studies, field measurements at two climatically contrasting European sites, laboratory testing, and corridor-level validation on two operational TSO case studies - a cross-border corridor spanning Croatia, Slovenia and Italy, and a TSO-DSO case study in Portugal. The consortium of 17 partners from 7 countries brings together 3 equipment manufacturers, 5 system operators, 7 research institutions, 1 design and engineering company and 1 exploitation expert company. AC2MTDC directly responds to topic HORIZON-CL5-2026-03-D3-19 by developing affordable, sustainable primary equipment for future-ready multi-terminal HVDC systems, addressing the call-specified pathway of HVAC overhead line conversion to HVDC. |
Location
Country | Croatia, France, Slovenia, Germany, Switzerland, Italy, Portugal |
Source
Source | EU Funding & Tenders Portal |
URL |
More Details
Record type | Project |
Sector | Commercial |
Article published date | 2026-11-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project