Academic Building
Sector: Commercial • Location: San Francisco, California, United States of America
Source: Dodge USA
Demolish 3 buildings at the north end of the Saint Ignatius College Preparatory High School Campus and replace them with a new academic building. The existing buildings to be removed include a 1-story dining hall with a kitchen, a 1-story chapel, and a 4-story administrative office building that was formerly a dormitory.
- Status
- Prospective
- Sector
- Commercial, Education, Residential, Cement
- Location
- San Francisco, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Academic Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Demolish 3 buildings at the north end of the Saint Ignatius College Preparatory High School Campus and replace them with a new academic building. The existing buildings to be removed include a 1-story dining hall with a kitchen, a 1-story chapel, and a 4-story administrative office building that was formerly a dormitory. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Francisco |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Education, Residential, Cement |
Article published date | 2024-06-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
