Academy Gymnasium Upgrades REBID
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Scope - The Project includes Materials, Labors and Equipment for 1. Cover and protect existing flooring prior to demolition and painting. 2. Cover and protect or remove existing wall and ceiling mounted items to remain prior to painting. 3. Demo of all existing acoustical wall and beam mounted panels and any remaining adhesive. 4. Sand, repair as needed, clean, primer and paint existing wood doors
- Status
- Closed
- Sector
- Commercial, Manufacturing (Industrial)
- Location
- Columbus, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Academy Gymnasium Upgrades REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | notice of completion |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope - The Project includes Materials, Labors and Equipment for 1. Cover and protect existing flooring prior to demolition and painting. 2. Cover and protect or remove existing wall and ceiling mounted items to remain prior to painting. 3. Demo of all existing acoustical wall and beam mounted panels and any remaining adhesive. 4. Sand, repair as needed, clean, primer and paint existing wood doors Gymnasium side only, Trim and paneling. 5. Sand, repair as needed, clean, primer and paint exist... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Columbus |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Manufacturing (Industrial) |
Article published date | 2024-06-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
