Acajutla Gas-Fired Power Plant and LNG Terminal
Sector: LNG • Location: El Salvador
Source: World Bank Group
The financing will be used for the development, operation and maintenance of a 378 MW gas-fired power plant and the supporting infrastructure located at Acajutla port project in El Salvador. The energy import asset includes a dedicated floating storage regasification unit (FSRU) and natural gas pipelines comprising a 1.3km subsea pipeline and a 500 meter onshore underground pipeline. Acajutla Ener
- Status
- Prospective
- Sector
- LNG, Natural Gas, Power Generation (CCGT), Seaport, Government, Manufacturing (Industrial), Commercial
- Location
- El Salvador
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Acajutla Gas-Fired Power Plant and LNG Terminal
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The financing will be used for the development, operation and maintenance of a 378 MW gas-fired power plant and the supporting infrastructure located at Acajutla port project in El Salvador. The energy import asset includes a dedicated floating storage regasification unit (FSRU) and natural gas pipelines comprising a 1.3km subsea pipeline and a 500 meter onshore underground pipeline. Acajutla Energy and Port project will also feature a 44km transmission line connecting the power plant to a substation of same name. The Acajutla Energy and Port project is located at the port of Acajutla in the Department of Sonsonate. Total financing has a 88:12 debt-to-equity ratio, with the debt portion totaling $772 million. IFC’s investment comprises: USD100 million A loan; USD65 million from IFC acting as implementing entity for the managed co-lending portfolio programme; USD30 million in credit guarantee. IDB Invest provided an 18-year, $115 million debt package and OPIC is providing a $350 million loan. In addition, KfW IPEX-Bank, Finnish Export Credit and Finnish state-owned Finnvera financed a $142 million loan tranche. EDP was awarded a 20-year PPA to provide 378MW of gas-fired base-load electricity with the government of El Salvador, in a tender held in 2013. Sponsors of the project are Invenergy that holds 85% interest in the facility and and Quantum Energy Partners that holds another 15%. Financial close took place on December 23, 2019. https://ijglobal.com/data/transaction/43085/acajutla-gas-fired-power-plant-378mw-and-lng-terminal https://sv.usembassy.gov/opic-approves-350-million-development-project-in-el-salvador/ https://www.prnewswire.com/news-releases/energia-del-pacifico-closes-financing-on-largest-ever-foreign-direct-investment-in-el-salvador-300978857.html |
Original sector | Energy |
Budget |
Location
Country | El Salvador |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | LNG, Natural Gas, Power Generation (CCGT), Seaport, Government, Manufacturing (Industrial), Commercial |
Article published date | 2024-09-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More LNG projects in El Salvador
- Acajutla Gas-Fired Power Plant and LNG Terminal
- Energia del Pacifico LNG Thermo Power Project
- Floating Storage Regasification Unit for Acajutla LNG to Power Project
- Energia del Pacifico LNG Thermo Power Project
- Acajutla LNG-to-Power Project
- Acajutla Gas-Fired Power Plant and LNG Terminal
- Acajutla Gas-Fired Power Plant and LNG Terminal
- Acajutla Gas-Fired Power Plant and LNG Terminal
