Accalia Point Solar Project
Sector: Solar • Location: Texas, USA
Source: Batteries News
The Accalia Point project is a 221 MWdc solar facility located in Cameron County, Texas, USA. It has completed all development work and is approaching the shovel-ready stage.
- Status
- Prospective
- Sector
- Solar, Energy Storage
- Location
- Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Batteries News
ConstructChat
Ask ConstructChat about Accalia Point Solar Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Accalia Point project is a 221 MWdc solar facility located in Cameron County, Texas, USA. It has completed all development work and is approaching the shovel-ready stage. |
Original sector | Renewable Energy |
Location
Country | United States of America (USA) |
State | Texas |
Source
Source | Batteries News |
URL |
More Details
Record type | Project |
Sector | Solar, Energy Storage |
Article published date | 2025-02-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Solar projects in USA
- Rice University Data Center Heat to Electricity Project
- Hortech Corporate Campus
- Tip Top Mine Renewable Energy and Heritage Tours
- Octave Mine Sustainable Development Project
- Luther College Carbon Neutrality Initiative
- Solar and Battery Systems for West Arlington Apartments
- Pad-Mounted Transformers Supply Contract
- San Diego Natural History Museum Roof Replacement and Upgrades
