logo

Accelerated bridge construction I-635 over Seagoville Road

Sector: Automotive • Location: United States of America (USA)

Source: Texas Department of Transportation (TxDOT)

Project

The TxDOT Dallas District project features the accelerated bridge construction method. In the span of two weekends, the rapid replacement of the 50-year-old bridge on I-635 will be removed and replaced. The ABC method marks a paradigm shift in the project planning and procurement. It uses innovative planning, design, materials and construction methods in a safe and cost-effective manner. The ABC m

Project Information FAQ

Project Information

3 Q
The project “Accelerated bridge construction I-635 over Seagoville Road” is an infrastructure initiative in the Automotive sector, located in United States of America (USA). Taiyo aggregates data on it from Texas Department of Transportation (TxDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The TxDOT Dallas District project features the accelerated bridge construction method. In the span of two weekends, the rapid replacement of the 50-year-old bridge on I-635 will be removed and replaced. The ABC method marks a paradigm shift in the project planning and procurement. It uses innovative planning, design, materials and construction methods in a safe and cost-effective manner. The ABC method also reduces the onsite construction time from months or years to just days or weeks. TxDOT chose the ABC approach due to high traffic volumes on one of the busiest highways in North Texas and the lack of logical detours. An estimated 142,000 to 154,000 drivers traverse the busy roadway each day, and 11 percent of those vehicles are large trucks.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data