logo

Access to the Pacific Ocean in the Panama Canal- Pac 4

Sector: Hydro • Location: Panama

Source: FCC Construction

Project
Closed

This project is situated along the Panama Canal and consists of the excavation of a new course in the Canal that will connect the new locks with the so-called Corte Culebra, the narrowest strip of the waterway close to the Pacific Ocean entrance to the Canal.The works, consist of the construction of 3.7 kilometres of approach to the Pacific Locks, with a 200-metre width.It includes the installatio

Project Information FAQ

Project Information

3 Q
The project “Access to the Pacific Ocean in the Panama Canal- Pac 4” is an infrastructure initiative in the Hydro sector, located in Panama. Taiyo aggregates data on it from FCC Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project is situated along the Panama Canal and consists of the excavation of a new course in the Canal that will connect the new locks with the so-called Corte Culebra, the narrowest strip of the waterway close to the Pacific Ocean entrance to the Canal.The works, consist of the construction of 3.7 kilometres of approach to the Pacific Locks, with a 200-metre width.It includes the installation of containment structure made up of cellular coffer dams along more than 1.5 kilometres that allows the construction of a 2.9-kilometre long earth and rock dam with an impermeable clay core, with a base approximately 150 metres long and 26 metres high and a 30-metre wide crest.The works include the excavation, transport and dumping of some 27 million cubic metres of mainly rocky material.In addition, the access roadway sand diversion water drainage channels will be constructed, together with tanks and the cleaning of approximately 80 hectares of firing ranges.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data