Accessible Pedestrian Signal Upagrade Phase 2
Sector: Power Generation (CCGT) • Location: West Hartford, Connecticut, United States of America
Source: Dodge
Trout Brook Drive at Boulevard - Upgrade push buttons to APS, install conduit and pedestal with signal heads, construct ADA ramps, construct concrete sidewalk. Boulevard at Quaker Lane South - Install pedestrian signal heads, upgrade push buttons to APS, upgrade ramps to ADA, install signs . Farmington Ave at North Quaker Lane/Quaker Lane South - Upgrade push buttons to APS, install conduit and pe
- Status
- Closed
- Sector
- Power Generation (CCGT), Car parking, Road, Automotive, Cement, Government, Power Transmission, Commercial
- Location
- West Hartford, Connecticut, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Accessible Pedestrian Signal Upagrade Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Trout Brook Drive at Boulevard - Upgrade push buttons to APS, install conduit and pedestal with signal heads, construct ADA ramps, construct concrete sidewalk. Boulevard at Quaker Lane South - Install pedestrian signal heads, upgrade push buttons to APS, upgrade ramps to ADA, install signs . Farmington Ave at North Quaker Lane/Quaker Lane South - Upgrade push buttons to APS, install conduit and pedestals with signal heads, construct ADA ramps, construct concrete sidewalk. Raymond Road at Isha... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Connecticut |
City | West Hartford |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Car parking, Road, Automotive, Cement, Government, Power Transmission, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
