Accessible Pedestrian Signals Systems - Phase 4
Closed · California · Last reported Dec 2024
Source: Dodge USA
The Accessible Pedestrian Signal Systems Project - Phase 4 is aimed to enhance safety and accessibility of pedestrian crossings for locations where it may assist the visually and hearing impaired. This project is federally-funded by a Community Development Block Grant ("CDBG") and will require the contractor to abide by the federal requirements listed in the bid documents.
- Status
- Closed
- Sector
- Commercial, Government, Consumer Products, Road
- Location
- Lake Forest, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Accessible Pedestrian Signals Systems - Phase 4
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Accessible Pedestrian Signal Systems Project - Phase 4 is aimed to enhance safety and accessibility of pedestrian crossings for locations where it may assist the visually and hearing impaired. This project is federally-funded by a Community Development Block Grant ("CDBG") and will require the contractor to abide by the federal requirements listed in the bid documents. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Lake Forest |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Government, Consumer Products, Road |
Article published date | 2024-12-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
