logo

Accessible Washroom and Equipment Storage for Soccer Recreational Facility

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

• To meet a community need and service gap. The soccer field was completed in 2015 without permanent washroom facilities and lacks washrooms that are much needed • To provide accessibility at this sports facility • To provide clean drinking water and shade for sports participants and spectators • To create an energy-efficient, low maintenance asset that will represent good dollar value • To align

Project Information FAQ

Project Information

3 Q
The project “Accessible Washroom and Equipment Storage for Soccer Recreational Facility” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

• To meet a community need and service gap. The soccer field was completed in 2015 without permanent washroom facilities and lacks washrooms that are much needed • To provide accessibility at this sports facility • To provide clean drinking water and shade for sports participants and spectators • To create an energy-efficient, low maintenance asset that will represent good dollar value • To align with our 25-year Sustainable Strategic Plan - 2013 Contractors will be selected through a competitive, best value tender. A building outfitted with washrooms and sports equipment storage, with provision for a future snack bar will be constructed. It will have two regular washroom stalls and one accessible washroom stall (men’s and women’s), sinks, motion-sensitive taps and lighting, and a water station. Plumbing, water, and electrical will be installed. Following site clean-up and final inspection, it will be commissioned for public use. • A 1,583.05 sq. ft. washroom, storage building - constructed • Over 600 players and supporters will have washrooms, clean drinking water, a sun-shade, and future snack bar • A priority identified in the Municipality’s Recreation and Leisure Services Master Plan - completed • Stage two of development at the Soccer Fields (Planned Action for 2013-2018)- completed • A successful project that aligns with the intent of Brockton’s Sustainable Strategic Plan ‘Building a Better Brockton’ - completed

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data