logo

Acciona Benban 2

Sector: Water Supply and Storage • Location: Egypt, Arab Republic of

Source: International Finance Corporation (IFC)

Project
Active

The project is a greenfield 50 MW photovoltaic (PV) plant which is part of Round 2 of the Egyptian Government feed-in-tariff (FiT) scheme for domestic solar PV and wind energy projects. The project company will be named “Rising Sun Energy SAE” as a temporary nomination until the company SPV name is formally established (expected in early July 2017).  The project is being developed by a Special Pur

Project Information FAQ

Project Information

4 Q
The project “Acciona Benban 2” is an infrastructure initiative in the Water Supply and Storage sector, located in Egypt, Arab Republic of. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project is a greenfield 50 MW photovoltaic (PV) plant which is part of Round 2 of the Egyptian Government feed-in-tariff (FiT) scheme for domestic solar PV and wind energy projects. The project company will be named “Rising Sun Energy SAE” as a temporary nomination until the company SPV name is formally established (expected in early July 2017).  The project is being developed by a Special Purpose Vehicle (SPV) owned by a Joint Venture (JV) consortium of Acciona Energía Global and ENARA Bahrain SPV (consisting of Swicorp, KCC Corporation and the Shoaibi Group), and TBEA Xinjiang SunOasisCo. Ltd.  The project SPV will be owned 38% by Acciona Energia, 38% by ENARA (investment vehicle of Swicorp), and 24% by TBEA Xianjiang.  This JV consortium are “the sponsors”, however Acciona will be responsible for the quality and environmental, social, health and safety management (ESHS) oversight of the project. The sponsors will own the project company “Rising Sun Energy SAE”, and have selected TBEA (also one of the sponsors) as the Engineering, Procurement, and Construction (EPC) and Operations and Maintenance (O&M) contractor.  The total project cost is up to US$70-75 million with an IFC A loan of up to US$17.5-20 million and syndications of up to US$45 million, and the balance covered by equity. The project will be located within Egypt’s New and Renewable Energy Agency (NREA)’s 37.2 km2 Benban 1.8 GW PV solar park comprising 39 separate PV plots, situated 12 km west of the nearest village (Benban), and 15 km west of the Nile River.  It is 40 km northwest of Aswan city, in the Aswan Governorate of Upper Egypt. The project occupies a 97-hectare plot (SBN 10-2) located in the second row within the central area of the Benban PV solar park.  The plot was previously being developed by another developer (Nubian For Renewable Energy SAE) under Round 1 of the FiT Scheme and the sponsors have since acquired the plot for development as part of Round 2.  The Benban PV solar park is being constructed on open desert land that is owned by the Government of Egypt.  The area is mainly flat, with sand and gravel dunes, and with no notable natural vegetation and no human activities, and all of the 39 PV development sites are greenfield.  Three developers were qualified from Round 1, and one has started some preliminary works and constructed some basic facilities on the site including office, dispensary, workers resting area, and installed underground septic tanks, none of which are yet operational.  There are two access roads connecting to the Aswan-Luxor Highway, approximately 1 km away from the solar park.  There will also be a road network on-site, which would be developed by NREA  The project includes the construction by EETC of an approximately 1 km underground 22 kV transmission line connecting the project to substation 2 (SS2), the nearest of four EETC high voltage substations, (on the eastern corner of the Benban PV solar park). Substation SS2 is expected to be fully constructed by December 2017. The underground transmission line right-of-way will follow the route of internal Benban PV solar park roads and be installed by EETC. Substation SS2 will be initially connected to the 220 kV high voltage overhead line located approximately 12 km east of the Benban PV solar park, until upgrades are made to the high voltage line. To evacuate the energy produced by the 39 projects located at the solar park, in addition to the underground connections and substations, EETC will also be responsible for designing and building 220 kV overhead transmission lines that will connect the solar park to existing transmission corridors. At a later stage, an additional 180 km double circuit 500 kV transmission line will be constructed by EETC north of the site. EETC will be responsible for the procurement and development of the corresponding environmental and social assessments (ESIAs) for all the elements listed above. Water for the project is expected to be supplied by groundwater wells licensed by the Ministry of Water Resources and Irrigation (MWRI). Water distribution in the Benban PV solar park will be managed by the Benban PV solar park’s facilities management company (FMC). "Rising Sun Energy SAE" is one of two 50MW developments being undertaken by the sponsors at the Benban Solar Complex, the other being "SunRise Energy SAE" located on plot SBN 18-3.  In addition, Acciona Energia and ENARA Bahrain are the sponsors for the "Al Subh Solar SAE" project located on SBN 28-4.  Acciona and ENARA Bahrain have informed that all three projects will be developed under Round 2 of the FiT scheme with similar construction schedules, and designs, and that the ESHS management arrangements to be adopted for all sites will be the same.  As mentioned in the section on PS1 below, the proposed FMC will be hired to undertake or direct the management of cross cutting construction and operation activities for all the Benban PV solar park on behalf of the solar developers.  This approach will assist in ensuring that E&S risks are managed consistently and there is a well-managed and coordinated response to overarching cumulative issues such as occupational health and safety, transport / traffic management, security, community engagement and corporate social responsibility, and labor, worker welfare and accommodation, among others. The project will be comprised of a single axis tracking system of approximately 182,790 PV panels with a nominal capacity of 50 MW AC and a peak capacity of 59.4 MW DC.  Power will be sent to inverters and fed into the utility power grid system through the EETC substation.  Project procurement and construction will take place by approximately November 2017, and the plant will be operational for a 25-year period, with options to extend the lease after that date.  The FMC will be responsible for managing water and wastewater services, waste management services, logistics and overarching security services, and worker accommodation, all of which will be developed once the FMC is appointed.  It is anticipated that approximately 500 workers will be employed at the project during construction, and 15 workers during operation, as well as 20 security personnel.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data