Acciona Benban 3

The status, timeline and source of this project. A free account opens every field.

Source: IFC Project Disclosures

The project is a greenfield 50 MW photovoltaic (PV) plant which is part of Round 2 of the Egyptian Government feed-in-tariff (FiT) scheme for domestic solar PV and wind energy projects. The project company will be named “SunRise Energy SAE” as a temporary nomination until the company SPV name is formally established (expected in early July 2017).  The project is being developed by a Special P

Status
Prospective
Sector
Road, Wind, Solar, Residential, Water Supply and Storage, Power Transmission, Government, Commercial, Power Generation (CCGT)
Location
Egypt
Updated
19 Nov 2026
Source
IFC Project Disclosures

ConstructChat

Ask ConstructChat about Acciona Benban 3

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Acciona Benban 3” is an infrastructure initiative in the Road sector, located in Egypt, Arab Republic of. Taiyo aggregates data on it from IFC Project Disclosures.

Participants

Not available for this record.

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The project is a greenfield 50 MW photovoltaic (PV) plant which is part of Round 2 of the Egyptian Government feed-in-tariff (FiT) scheme for domestic solar PV and wind energy projects. The project company will be named “SunRise Energy SAE” as a temporary nomination until the company SPV name is formally established (expected in early July 2017).  The project is being developed by a Special Purpose Vehicle (SPV) owned by a Joint Venture (JV) consortium of Acciona Energía Global and ENARA Bahrain SPV (consisting of Swicorp, KCC Corporation and the Shoaibi Group), and TBEA Xinjiang SunOasisCo. Ltd.  The project SPV will be owned 38% by Acciona Energia, 38% by ENARA (investment vehicle of Swicorp), and 24% by TBEA Xianjiang.  This JV consortium are “the sponsors”, however Acciona will be responsible for the quality and environmental, social, health and safety management (ESHS) oversight of the project. The sponsors will own the project company “SunRise Energy SAE”, and have selected TBEA (also one of the sponsors) as the Engineering, Procurement, and Construction (EPC) and Operations and Maintenance (O&M) contractor.  The total project cost is up to US$70-75 million with an IFC A loan of up to US$17.5-20 million and syndications of up to US$45 million, and the balance covered by equity. The project will be located within Egypt’s New and Renewable Energy Agency (NREA)’s 37.2 km2 Benban 1.8 GW PV solar park comprising 39 separate PV plots, situated 12 km west of the nearest village (Benban), and 15 km west of the Nile River.  It is 40 km northwest of Aswan city, in the Aswan Governorate of Upper Egypt. The project occupies a 97-hectare plot (SBN 18-3) located in the third row within the central area of the Benban PV solar park.  The plot was previously being developed by another developer (Al Siraj Solar SAE) under Round 1 of the FiT Scheme and the sponsors have since acquired the plot for development as part of Round 2.  The Benban PV solar park is being constructed on open desert land that is owned by the Government of Egypt.  The area is mainly flat, with sand and gravel dunes, and with no notable natural vegetation and no human activities, and all of the 39 PV development sites are greenfield.  Three developers were qualified from Round 1, and one has started some preliminary works and constructed some basic facilities on the site including office, dispensary, workers resting area, and installed underground septic tanks, none of which are yet operational.  There are two access roads connecting to the Aswan-Luxor Highway, approximately 1 km away from the solar park.  There will also be a road network on-site, which would be developed by NREA  The project includes the construction by EETC of an approximately 1 km underground 22 kV transmission line connecting the project to substation 3 (SS3), the nearest of four EETC high voltage substations, (on the eastern corner of the Benban PV solar park). Substation SS3 is expected to be fully constructed by December 2017. The underground transmission line right-of-way will follow the route of internal Benban PV solar park roads and be installed by EETC. Substation SS3 will be initially connected to the 220 kV high voltage overhead line located approximately 12 km east of the Benban PV solar park, until upgrades are made to the high voltage line. To evacuate the energy produced by the 39 projects located at the solar park, in addition to the underground connections and substations, EETC will also be responsible for designing and building 220 kV overhead transmission lines that will connect the solar park to existing transmission corridors. At a later stage, an additional 180 km double circuit 500 kV transmission line will be constructed by EETC north of the site. EETC will be responsible for the procurement and development of the corresponding environmental and social assessments (ESIAs) for all the elements listed above. Water for the project is expected to be supplied by groundwater wells licensed by the Ministry of Water Resources and Irrigation (MWRI). Water distribution in the Benban PV solar park will be managed by the Benban PV solar park’s facilities management company (FMC). “SunRise Energy SAE” is one of two 50MW developments being undertaken by the sponsors at the Benban Solar Complex, the other being “Rising Sun Energy SAE” located on plot SBN 10-2. In addition, Acciona Energia and ENARA Bahrain are the sponsors for the “Al Subh Solar SAE” project located on SBN 28-4.  Acciona and ENARA Bahrain have informed that all three projects will be developed under Round 2 of the FiT scheme with similar construction schedules, designs, and that the ESHS management arrangements to be adopted for all sites will be the same.  As mentioned in the section on PS1 below, the proposed FMC will be hired to undertake or direct the management of cross cutting construction and operation activities for all the Benban PV solar park on behalf of the solar developers. 

Original sector

V-BF - Solar - Renewable Energy Generation

Location

Country

Egypt

Source

Source

IFC Project Disclosures

URL

More Details

Record type

Project

Sector

Road, Wind, Solar, Residential, Water Supply and Storage, Power Transmission, Government, Commercial, Power Generation (CCGT)

Article published date

2026-09-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project