Accra - Takoradi road dualization PPP project
The status, timeline and source of this project. A free account opens every field.
Source: InfraPPPWorld
The 208.8km road project consists of 2-lane dual carriageway with service roads & walkways (within built up areas), bridges, underpasses, overpasses and interchanges.It runs close to the coast and links the national capital, Accra, to Sekondi-Takoradi, the capital of the Western Region where one of the two existing sea ports in the country is located. It includes a six lane dual carriageway with f
- Status
- Prospective
- Sector
- Seaport, Road, Government
- Location
- Ghana
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Accra - Takoradi road dualization PPP project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | project in planning |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The 208.8km road project consists of 2-lane dual carriageway with service roads & walkways (within built up areas), bridges, underpasses, overpasses and interchanges.It runs close to the coast and links the national capital, Accra, to Sekondi-Takoradi, the capital of the Western Region where one of the two existing sea ports in the country is located. It includes a six lane dual carriageway with full access control for sections with high traffic and interchanges in highly trafficked intersections.The private sponsor will be responsible for the:a) design, financing, construction of new or expansion of existing traffic lanes and structures, such as interchanges and bridges;b) efficient operation and maintenance of the road, construction and operation of toll booths and collection of toll revenues; andc) extension of protection measures to prevent road closures due to obstructions on the roadway. |
Original sector | Transport |
Procurement method |
Location
Country | Ghana |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Seaport, Road, Government |
Article published date | 2025-03-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
