logo

Accra Sea Water Desalination Plant

Sector: Car parking • Location: Ghana

Source: Water Technology

Project
Closed

The Accra desalination plant uses reverse osmosis technique to convert sea water into potable water. Reverse osmosis racks and pumping facilities of the Accra desalination plant. The plant utilises 146,400 cubic metres of raw intake water. Interior view of the Accra desalination plant. Reverse osmosis racks of the Accra desalination plant. Official inauguration of Accra desalination plant was held

Project Information FAQ

Project Information

4 Q
The project “Accra Sea Water Desalination Plant” is an infrastructure initiative in the Car parking sector, located in Ghana. Taiyo aggregates data on it from Water Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Accra desalination plant uses reverse osmosis technique to convert sea water into potable water. Reverse osmosis racks and pumping facilities of the Accra desalination plant. The plant utilises 146,400 cubic metres of raw intake water. Interior view of the Accra desalination plant. Reverse osmosis racks of the Accra desalination plant. Official inauguration of Accra desalination plant was held in April 2015. The Accra sea water desalination plant is located at Nungua in the Kpeshie district, and is the first desalination plant built in Ghana. The plant started commercial operation in March 2015 and was officially inaugurated in April 2015. The $125m project has a capacity to desalinate 60,000m3 of sea water a day providing fresh water to more than 300,000 people in various municipalities of the Greater Accra administrative region. It marks a significant step in improving drinking water facilities in the country, which is witnessing rapid population growth. The plant was designed, constructed and is being operated by Befesa Desalination Developments Ghana, a joint venture of Abengoa Water Investments Ghana, Daye Water Investment (Ghana), and local partner Hydrocol. Befesa operates and will maintain the plant for 25 years. Construction started in November 2012, creating 400 direct and indirect jobs in the region. The Shuwaikh RO Project involves the construction of a sea water desalination plant in the Kingdom of Kuwait. Accra has an estimated population of three million people. With a growing population, Ghana is struggling to meet the required water demands of the people from surrounding towns and villages. The existing water resources are enough to meet 50% of the 800,000m3/day of water required. To address this issue, the Ghanaian authorities have prioritised water supply projects under the country’s Economic Recovery Programme. The Accra sea water desalination plant was constructed as a part of the programme and supplies drinking water to more than 500,000 residents in the towns of Teshie, Nungua, and Tema. It also helps reduce water shortages in the area and contributes to the growth of the local economy. A contract was signed between Abengoa and Ghana Water Limited Company (GWCL) for the construction and operation of a new desalination plant in the town of Nungua in April 2011. The design, build, operate, maintain, own and transfer (DBOT) contract also included the installation of infrastructure required for the seawater intake, an ultra-filtration pre-treatment system, desalination technology, and efficient energy recovery solutions. The GWCL buys the potable water from the company through a purchase agreement and distributes it to residents and businesses in the Teshie-Nungua area. The project is expected to generate revenue of approximately $1.3m over a 25-year period. The project involves the construction of a 60,000m3/day seawater reverse osmosis desalination plant in a 6.1-acre site situated at the beachfront, 400m west of the Nungua fish landing site. The desalination plant includes four trains, which feature two high-pressure pumps, one standby pump and 12 energy recovery systems each. The plant uses reverse osmosis to convert sea water into potable water. It converts half of the intake into potable produce, while the remaining drains out through outfall brine. The plant utilises 146,400m3 of raw intake water to produce 60,000m3 of potable water and 70,000m3 of rejected brine a day. Other facilities constructed on the site include an intake pipe, an outfall pipe and a parking lot. The outfall pipe is 150m and features four diffusers located 4m apart. The outfall is buried in a covered trench to protect it from the sea waves. Water from the desalination plant is being delivered to a GWCL connection point by Befesa Desalination Developments Ghana through pipes. The Multilateral Investment Guarantee Agency (MIGA) sanctioned a loan of $179m for the project in November 2012. Investors have applied for MIGA guarantees for a period of up to 20 years for the equity investments, 14 years for the shareholder loans, and 12 years for the non-shareholder loans.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data