ACCRA TEMA WATER SUP
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The project is the extension of the water distribution system in Accra and Tema, installation of water meters and other ancillary equipment, provision of a sewerage system for central Accra and related consulting services. The proposed credit would cover the entire foreign exchange cost of the project, and the proceeds would be applied towards purchase of water and sewer pipes and accessories, pum
- Status
- Closed
- Sector
- Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Government
- Location
- Ghana
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about ACCRA TEMA WATER SUP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is the extension of the water distribution system in Accra and Tema, installation of water meters and other ancillary equipment, provision of a sewerage system for central Accra and related consulting services. The proposed credit would cover the entire foreign exchange cost of the project, and the proceeds would be applied towards purchase of water and sewer pipes and accessories, pumps, mechanical and electrical equipment and the foreign exchange component of installation costs and consultants' services. Though GWSC lacks experience in utility management, it has a number of qualified engineers and accountants on its staff. It is expected that the Accra-Tema area organization of GWSC, which is headed by a seasoned area manager, will, with the assistance of consultants, be able to carry out and operate the project satisfactorily. |
Original sector | Water, Sanitation and Waste Management |
Location
Country | Ghana |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Ghana
- Establishment of Commercial Poultry Farm
- Ghalia Ghana Company Limited
- Zoompak Teshie Transfer Station and Medical Waste Treatment Facility
- Ghana - Improved Sanitation and Water Supply Service Delivery to the Urban Poor in Ghana through Tripartite Partnerships
- Bridge Power Project Tema
- Fruits and Vegetables Production
- Production of Salt
- Tema Container Terminal
