logo

Achiras Wind Power Project

Sector: Raw Materials • Location: Argentina

Source: Inter-American Development Bank (IADB)

Project
In Implementation

The Achiras Wind Power Project (the “Project”) consists of the construction, operation, and maintenance of a 47,25MW wind farm and related facilities, including a 132KV 16 km-long transmission line that will be located in the Rio Cuarto Department, in the southwest area of the Cordoba Province in Argentina. The Project total cost is estimated in US$81 million, to be financed with an IDB Group “A”

Project Information FAQ

Project Information

4 Q
The project “Achiras Wind Power Project” is an infrastructure initiative in the Raw Materials sector, located in Argentina. Taiyo aggregates data on it from Inter-American Development Bank (IADB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

in implementation

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Achiras Wind Power Project (the “Project”) consists of the construction, operation, and maintenance of a 47,25MW wind farm and related facilities, including a 132KV 16 km-long transmission line that will be located in the Rio Cuarto Department, in the southwest area of the Cordoba Province in Argentina. The Project total cost is estimated in US$81 million, to be financed with an IDB Group “A” Loan of approximately US$27 million. Such financing will be supplemented by an IFC “A” Loan, and the participation of a local bank for local content equipment financing, and capital contributions. The Project will have positive impacts on development, such as: (i) adding 47,25MW of renewable capacity to the Argentine grid in order to diversify the energy matrix that relies mostly on hydro and thermal power generation, and representing 20% of the total installed capacity goal of non-conventional renewable energy (NCRE) by 2025, and (ii) displacing around 100,000 equivalent tons of carbon emissions per year.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data