logo

Aclara Rare Earth Separation Plant and Carina Open-Pit Deposit

Sector: Chemical (Industrial) • Location: Vinton and "", Louisiana and Goiás, United States and Brazil

Source: Geomechanics.io

Project
Planned

Aclara Resources has commissioned a rare earth separation pilot plant at Virginia Tech in Blacksburg to validate its proprietary flowsheet ahead of a commercial-scale plant at Port of Vinton, Louisiana, due in 2027. The project targets light and heavy rare earth oxides from ionic clays in Brazil and Chile, with feed anchored by the Carina open-pit deposit in Goiás, Brazil, forecast to produce rare

Status
Prospective
Sector
Chemical (Industrial), Warehouse, Manufacturing (Industrial), Commercial
Location
Vinton and "", Louisiana and Goiás, United States and Brazil
Updated
22 Jul 2026
Source
Geomechanics.io

ConstructChat

Ask ConstructChat about Aclara Rare Earth Separation Plant and Carina Open-Pit Deposit

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Aclara Rare Earth Separation Plant and Carina Open-Pit Deposit” is an infrastructure initiative in the Chemical (Industrial) sector, located in Vinton and "", Louisiana and Goiás, United States and Brazil. Taiyo aggregates data on it from Geomechanics.io.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Aclara Resources has commissioned a rare earth separation pilot plant at Virginia Tech in Blacksburg to validate its proprietary flowsheet ahead of a commercial-scale plant at Port of Vinton, Louisiana, due in 2027. The project targets light and heavy rare earth oxides from ionic clays in Brazil and Chile, with feed anchored by the Carina open-pit deposit in Goiás, Brazil, forecast to produce rare earth oxides over 18 years. The Carina project has a prefeasibility study estimating initial capex at US$548.3 million and a post-tax NPV8 of US$1.07 billion with a 21.8% IRR. Early works are targeted for mid-2026 with operations in 2028.

Original sector

Mining

Budget

Location

Country

United States and Brazil

State

Louisiana and Goiás

City

Vinton and ""

Source

Source

Geomechanics.io

URL

More Details

Record type

Project

Sector

Chemical (Industrial), Warehouse, Manufacturing (Industrial), Commercial

Article published date

2026-03-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project