Acleda Education
Pending · Cambodia
Source: International Finance Corporation (IFC)
The scope of this review includes assessing the capacity and systems of the company to oversee and monitor compliance of the project with IFC’s Performance Standards as well as national environmental, social and occupational health and safety regulatory requirements in Cambodia. The review relied on documents provided by the sponsor and AIB, and on interviews conducted by IFC with sponsor and comp
- Status
- Prospective
- Sector
- Water Supply and Storage, Education, Waste Processing and Treatment, Commercial, Biomass, Government
- Location
- Cambodia
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about Acleda Education
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | pending |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of this review includes assessing the capacity and systems of the company to oversee and monitor compliance of the project with IFC’s Performance Standards as well as national environmental, social and occupational health and safety regulatory requirements in Cambodia. The review relied on documents provided by the sponsor and AIB, and on interviews conducted by IFC with sponsor and company representatives including the Chief executive officer, the head of personnel and administration department, the manager of the mechanical and engineering Unit, the head of the engineering department and other responsible staff, as well as a contractor representative. IFC visited the Acleda Bank building expansion site with ongoing construction activities, the greenfield campus site, and interviewed local residents from 6-8 October 2014.IFC’s appraisal considered the environmental and social management planning process and documentation for the project, as described above, and gaps, if any, between these and IFC’s requirements. Where necessary, corrective measures intended to close these gaps within a reasonable period of time are summarized in the paragraphs that follow and in an agreed Environmental and Social Action Plan (ESAP). Through ESAP and management plan implementation, the project is expected to be designed and operated in accordance with Performance Standards objectives. |
Original sector | T-AC - Other Training |
Location
Country | Cambodia |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Education, Waste Processing and Treatment, Commercial, Biomass, Government |
Article published date | 2026-01-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Cambodia
- Koh Kong Bridge
- Stung Atay River Hydropower Station
- CAMBODIA IRRIGATED AGRICULTURE IMPROVEMENT
- BAKHENG WATER SUPPLY PROJECT
- Stung Tatay River Hydropower Dam, Koh Kong
- Lower Sesan 2 Hydropower Dam Construction
- Cambodia: Integrated Water Resources Management Project
- Integrated Urban Environmental Management in the Tonle Sap Basin Project
