logo
ProjectPending

Acleda Education

Sector: Education • Location: Cambodia

Source: IFC Project Disclosures

The scope of this review includes assessing the capacity and systems of the company to oversee and monitor compliance of the project with IFC’s Performance Standards as well as national environmental, social and occupational health and safety regulatory requirements in Cambodia. The review relied on documents provided by the sponsor and AIB, and on interviews conducted by IFC with sponsor an

Status
Prospective
Sector
Education, Commercial
Location
Cambodia
Updated
19 Nov 2026
Source
IFC Project Disclosures

ConstructChat

Ask ConstructChat about Acleda Education

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Acleda Education” is an infrastructure initiative in the Education sector, located in Cambodia. Taiyo aggregates data on it from IFC Project Disclosures.

Participants

Not available for this record.

Status

Original status

pending

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The scope of this review includes assessing the capacity and systems of the company to oversee and monitor compliance of the project with IFC’s Performance Standards as well as national environmental, social and occupational health and safety regulatory requirements in Cambodia. The review relied on documents provided by the sponsor and AIB, and on interviews conducted by IFC with sponsor and company representatives including the Chief executive officer, the head of personnel and administration department, the manager of the mechanical and engineering Unit, the head of the engineering department and other responsible staff, as well as a contractor representative. IFC visited the Acleda Bank building expansion site with ongoing construction activities, the greenfield campus site, and interviewed local residents from 6-8 October 2014.IFC’s appraisal considered the environmental and social management planning process and documentation for the project, as described above, and gaps, if any, between these and IFC’s requirements. Where necessary, corrective measures intended to close these gaps within a reasonable period of time are summarized in the paragraphs that follow and in an agreed Environmental and Social Action Plan (ESAP). Through ESAP and management plan implementation, the project is expected to be designed and operated in accordance with Performance Standards objectives.

Original sector

T-AC - Other Training

Location

Country

Cambodia

Source

Source

IFC Project Disclosures

URL

More Details

Record type

Project

Sector

Education, Commercial

Article published date

2026-09-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project