logo

Acleda Education

Sector: Water Supply and Storage • Location: Cambodia

Source: International Finance Corporation (IFC)

Project
Pending

The scope of this review includes assessing the capacity and systems of the company to oversee and monitor compliance of the project with IFC’s Performance Standards as well as national environmental, social and occupational health and safety regulatory requirements in Cambodia. The review relied on documents provided by the sponsor and AIB, and on interviews conducted by IFC with sponsor and comp

Project Information FAQ

Project Information

4 Q
The project “Acleda Education” is an infrastructure initiative in the Water Supply and Storage sector, located in Cambodia. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

pending

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The scope of this review includes assessing the capacity and systems of the company to oversee and monitor compliance of the project with IFC’s Performance Standards as well as national environmental, social and occupational health and safety regulatory requirements in Cambodia. The review relied on documents provided by the sponsor and AIB, and on interviews conducted by IFC with sponsor and company representatives including the Chief executive officer, the head of personnel and administration department, the manager of the mechanical and engineering Unit, the head of the engineering department and other responsible staff, as well as a contractor representative. IFC visited the Acleda Bank building expansion site with ongoing construction activities, the greenfield campus site, and interviewed local residents from 6-8 October 2014.IFC’s appraisal considered the environmental and social management planning process and documentation for the project, as described above, and gaps, if any, between these and IFC’s requirements. Where necessary, corrective measures intended to close these gaps within a reasonable period of time are summarized in the paragraphs that follow and in an agreed Environmental and Social Action Plan (ESAP). Through ESAP and management plan implementation, the project is expected to be designed and operated in accordance with Performance Standards objectives.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data