logo

ACME Jaipur 250MW Solar Power Plant

One of 10,000+ projects Taiyo tracks in India.

Source: World Bank Group

Project
Active

The project entails the construction of a 250 MW Solar Power Plant in Madhya Pradesh, India. The SPV is ACME Jaipur Solar Power a wholly owned subsidiary of the sponsor ACME Group which provides $ 56.53 million in equity while the rest of the finance is provided by a $ 60.5 million loan from IFC and $ 84.87 loan from L&T Infrastructure Finance Company. The execution type is BOT while the PPA perio

Status
Prospective
Sector
Power Generation (CCGT), Solar, Commercial, Government
Location
India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about ACME Jaipur 250MW Solar Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “ACME Jaipur 250MW Solar Power Plant” is an infrastructure initiative in the Power Generation (CCGT) sector, located in India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project entails the construction of a 250 MW Solar Power Plant in Madhya Pradesh, India. The SPV is ACME Jaipur Solar Power a wholly owned subsidiary of the sponsor ACME Group which provides $ 56.53 million in equity while the rest of the finance is provided by a $ 60.5 million loan from IFC and $ 84.87 loan from L&T Infrastructure Finance Company. The execution type is BOT while the PPA period is 25 years. Construction was completed on May 21, 2019. Financial close took place on February 2, 2018. https://mercomindia.com/sprng-energy-commissions-250-mw-solar-rewa/

Original sector

Energy

Budget

Location

Country

India

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Solar, Commercial, Government

Article published date

2024-05-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project