ACME Solar 100 MW Wind Power Project in Surendranagar
Sector: Solar • Location: Surendranagar, Gujarat, India
Source: Business Standard
ACME Solar Holdings has commissioned an additional 16 MW of its 100 MW wind power project in Surendranagar, Gujarat, following the commissioning of 28 MW in October 2025. The project uses SANY 4 MW turbines and is financed by Power Finance Corporation. Power generated will be supplied under a 25-year PPA with Gujarat Urja Vikas Nigam.
- Status
- Under Construction
- Sector
- Solar, Power Generation (CCGT), Wind
- Location
- Surendranagar, Gujarat, India
- Updated
- 22 Jul 2026
- Source
- Business Standard
ConstructChat
Ask ConstructChat about ACME Solar 100 MW Wind Power Project in Surendranagar
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | ACME Solar Holdings has commissioned an additional 16 MW of its 100 MW wind power project in Surendranagar, Gujarat, following the commissioning of 28 MW in October 2025. The project uses SANY 4 MW turbines and is financed by Power Finance Corporation. Power generated will be supplied under a 25-year PPA with Gujarat Urja Vikas Nigam. |
Original sector | Energy |
Location
Country | India |
State | Gujarat |
City | Surendranagar |
Source
Source | Business Standard |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT), Wind |
Article published date | 2025-11-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
