logo

Acme Solar Battery Energy Storage System (BESS) and Wind Projects

Sector: Energy Storage • Location: India

Source: Saur Energy

Project
Under Construction And Operational

Acme Solar Holdings commissioned one of India's largest Battery Energy Storage System (BESS) capacities of 2.32 GWh and fully commissioned a 100 MW wind project, the largest wind project of Acme Solar. The company also won a new 301 MW FDRE project with SECI during the quarter, increasing their under construction capacity and portfolio significantly. The firm targets a total BESS capacity of 20 GW

Status
Under Construction
Sector
Energy Storage, Wind, Solar
Location
India
Updated
22 Jul 2026
Source
Saur Energy

ConstructChat

Ask ConstructChat about Acme Solar Battery Energy Storage System (BESS) and Wind Projects

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Acme Solar Battery Energy Storage System (BESS) and Wind Projects” is an infrastructure initiative in the Energy Storage sector, located in India. Taiyo aggregates data on it from Saur Energy.

Participants

Not available for this record.

Status

Original status

under construction and operational

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Acme Solar Holdings commissioned one of India's largest Battery Energy Storage System (BESS) capacities of 2.32 GWh and fully commissioned a 100 MW wind project, the largest wind project of Acme Solar. The company also won a new 301 MW FDRE project with SECI during the quarter, increasing their under construction capacity and portfolio significantly. The firm targets a total BESS capacity of 20 GWh by 2030 and aims for a total generation capacity of 10 GWh by 2030.

Original sector

Energy

Budget

Location

Country

India

Source

Source

Saur Energy

URL

More Details

Record type

Project

Sector

Energy Storage, Wind, Solar

Article published date

2026-05-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project