logo

ACME Solar Holdings Fourth Phase Battery Energy Storage System Project

Sector: Solar • Location: Phalodi and Jodhpur, Rajasthan, India

Source: Scanx

Project
Commissioned

ACME Solar Holdings Limited has successfully commissioned the fourth phase of its Battery Energy Storage System (BESS) project in Rajasthan, adding 33.333 MW/160.48 MWh capacity. This phase is part of a larger 300 MW/1409.34 MWh BESS project located at Village Badi Sid, Tehsil-Bap, covering districts of Phalodi and Jodhpur in Rajasthan. The project is operated by ACME Sun Power Private Limited, a

Status
Under Construction
Sector
Solar, Power Generation (CCGT), Energy Storage
Location
Phalodi and Jodhpur, Rajasthan, India
Updated
22 Jul 2026
Source
Scanx

ConstructChat

Ask ConstructChat about ACME Solar Holdings Fourth Phase Battery Energy Storage System Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “ACME Solar Holdings Fourth Phase Battery Energy Storage System Project” is an infrastructure initiative in the Solar sector, located in Phalodi and Jodhpur, Rajasthan, India. Taiyo aggregates data on it from Scanx.

Participants

Not available for this record.

Status

Original status

commissioned

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

ACME Solar Holdings Limited has successfully commissioned the fourth phase of its Battery Energy Storage System (BESS) project in Rajasthan, adding 33.333 MW/160.48 MWh capacity. This phase is part of a larger 300 MW/1409.34 MWh BESS project located at Village Badi Sid, Tehsil-Bap, covering districts of Phalodi and Jodhpur in Rajasthan. The project is operated by ACME Sun Power Private Limited, a wholly owned subsidiary of ACME Solar Holdings Limited.

Original sector

Energy

Location

Country

India

State

Rajasthan

City

Phalodi and Jodhpur

Source

Source

Scanx

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT), Energy Storage

Article published date

2026-04-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project