logo

ACME Solar Holdings Rajasthan BESS Project

Sector: Energy Storage • Location: Rajasthan, India

Source: Trade Brains

Project
Under Construction

ACME Solar Holdings Limited has commissioned the fourth phase of its Battery Energy Storage System (BESS) project in Rajasthan, activating 33.333 MW / 160.48 MWh of battery storage capacity. The project aims for a total capacity of 300 MW / 1,409.34 MWh and supports India's clean energy grid by providing reliable energy storage. The site is located at Village Badi Sid, Tehsil-Bap, in the Phalodi a

Status
Under Construction
Sector
Energy Storage, Solar
Location
Rajasthan, India
Updated
22 Jul 2026
Source
Trade Brains

ConstructChat

Ask ConstructChat about ACME Solar Holdings Rajasthan BESS Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “ACME Solar Holdings Rajasthan BESS Project” is an infrastructure initiative in the Energy Storage sector, located in Rajasthan, India. Taiyo aggregates data on it from Trade Brains.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

ACME Solar Holdings Limited has commissioned the fourth phase of its Battery Energy Storage System (BESS) project in Rajasthan, activating 33.333 MW / 160.48 MWh of battery storage capacity. The project aims for a total capacity of 300 MW / 1,409.34 MWh and supports India's clean energy grid by providing reliable energy storage. The site is located at Village Badi Sid, Tehsil-Bap, in the Phalodi and Jodhpur districts of Rajasthan.

Original sector

Energy

Location

Country

India

State

Rajasthan

Source

Source

Trade Brains

URL

More Details

Record type

Project

Sector

Energy Storage, Solar

Article published date

2026-04-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project