Acquedotto Veneto Centrale
Sector: Water Supply and Storage • Location: Italy
Source: European Investment Bank (EIB)
The project consists of 173.5 km potable water supply pipelines and groundwater extraction works in Camazzole – Comune of Carmignano di Brenta – for a capacity of 950 l/s. A 131.6 km pipeline network representing a ring will interconnect Venice with Chioggia, Cavanella, Cavarzere, Padova and Gazzera. This ring will be connected to the Camazzole source through a 33.4 km pipeline and
- Status
- Under Construction
- Sector
- Water Supply and Storage, Government
- Location
- Italy
- Updated
- 22 Jul 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about Acquedotto Veneto Centrale
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | signed |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | <p>The project consists of 173.5 km potable water supply pipelines and groundwater extraction works in Camazzole – Comune of Carmignano di Brenta – for a capacity of 950 l/s. A 131.6 km pipeline network representing a ring will interconnect Venice with Chioggia, Cavanella, Cavarzere, Padova and Gazzera. This ring will be connected to the Camazzole source through a 33.4 km pipeline and to the Stanga reservoir through a 8.5 km pipeline.</p> |
Original sector | Water, sewerage |
Location
Country | Italy |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
