logo

Acquisition of Gas-Fired Power Stations in Texas

One of 10,000+ projects Taiyo tracks in Texas.

Source: Gas To Power Journal

Project
Awarded

LS Power has acquired three gas-fired power stations with a combined capacity of 2,145 MW from Brazos Electric. The assets include two baseload combined-cycle blocks in Jack County, one CCGT in Johnson County, and four peaking units in Palo Pinto County.

Status
Closed
Sector
Power Generation (CCGT)
Location
Texas, United States of America
Updated
22 Jul 2026
Source
Gas To Power Journal

ConstructChat

Ask ConstructChat about Acquisition of Gas-Fired Power Stations in Texas

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Acquisition of Gas-Fired Power Stations in Texas” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Texas, United States. Taiyo aggregates data on it from Gas To Power Journal.

Participants

Not available for this record.

Status

Original status

Awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

LS Power has acquired three gas-fired power stations with a combined capacity of 2,145 MW from Brazos Electric. The assets include two baseload combined-cycle blocks in Jack County, one CCGT in Johnson County, and four peaking units in Palo Pinto County.

Original sector

Energy

Location

Country

United States of America (USA)

State

Texas

Source

Source

Gas To Power Journal

URL

More Details

Record type

Project

Sector

Power Generation (CCGT)

Article published date

2025-03-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project