logo

Acquisition of Three Operational Hydroelectric Plants in Piedmont by Aruba

One of 73 projects Taiyo tracks in Piedmont.

Source: Megaproject

Project
Completed

Aruba acquired three fully operational run-of-river hydroelectric plants along the Stura di Lanzo in the province of Turin, located in Cafasse, Balangero, and Lanzo Torinese. These century-old plants, commissioned in 1922 and 1923, were originally built to power paper mills and looms. The acquisition increases Aruba's owned hydroelectric fleet to 11 plants with approximately 11.6 MW installed capa

Status
Closed
Sector
Power Generation (CCGT), Hydro, Data Center
Location
Cafasse, Balangero, Lanzo Torinese, Piedmont, Italy
Updated
22 Jul 2026
Source
Megaproject

ConstructChat

Ask ConstructChat about Acquisition of Three Operational Hydroelectric Plants in Piedmont by Aruba

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Acquisition of Three Operational Hydroelectric Plants in Piedmont by Aruba” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Cafasse, Balangero, Lanzo Torinese, Piedmont, Italy. Taiyo aggregates data on it from Megaproject.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Aruba acquired three fully operational run-of-river hydroelectric plants along the Stura di Lanzo in the province of Turin, located in Cafasse, Balangero, and Lanzo Torinese. These century-old plants, commissioned in 1922 and 1923, were originally built to power paper mills and looms. The acquisition increases Aruba's owned hydroelectric fleet to 11 plants with approximately 11.6 MW installed capacity and annual production above 60 GWh across four regions in Italy. The electricity generated is fed into Italy's national grid, and Aruba uses a compensation mechanism to credit self-produced volumes against its data centre power consumption, enhancing its renewable energy share.

Original sector

Energy

Location

Country

Italy

State

Piedmont

City

Cafasse, Balangero, Lanzo Torinese

Source

Source

Megaproject

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Hydro, Data Center

Article published date

2026-07-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project