ACS Marcona Wind Farm
Sector: Commercial • Location: Ica, Peru
Source: World Bank Group
Parque Eolica Marcona S.A. was created to build, own and operate a 32 MW wind farm in Nazca province, Peru. In 2011, the project company was a subsidiary of Consorcio Cobra, a Peruvian subsidiary of the Spanish Company ACS. The Marcona wind project was scheduled to have 16 2-MW turbines.
The project would sell power to the SEIN grid system and had obtained through tender a 20 year PPA to sell p
- Status
- Prospective
- Sector
- Commercial, Wind, Power Generation (CCGT), Raw Materials, Government
- Location
- Ica, Peru
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about ACS Marcona Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Parque Eolica Marcona S.A. was created to build, own and operate a 32 MW wind farm in Nazca province, Peru. In 2011, the project company was a subsidiary of Consorcio Cobra, a Peruvian subsidiary of the Spanish Company ACS. The Marcona wind project was scheduled to have 16 2-MW turbines. The project would sell power to the SEIN grid system and had obtained through tender a 20 year PPA to sell power from the Peruvian Ministry of Mines and Energy. Scheduled investment for the project was USD 61.1 million; the project's EIA had been approved in June, 2011, with commissioning scheduled for late 2012. In August 2013, the project was granted a US$ 55 million loan from CAF. Construction works were concluded in January 2014, and commercial operations commenced in April 2014. |
Original sector | Energy |
Budget |
Location
Country | Peru |
State | Ica |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Wind, Power Generation (CCGT), Raw Materials, Government |
Article published date | 2024-05-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
