ACSDF TL Hanna Front Entrance Improvements REBID
Sector: Manufacturing (Industrial) • Location: Anderson, South Carolina, United States of America
Source: Dodge
Location: TL Hanna Front Entrance 1. Approx ~ 160 ft x 40 ft (Contractor responsible for exact measurement). 2. Remove damaged concrete (see page 4). 3. Contractor is responsible for disposing of all concrete removed. 4. Contractor to ensure base material is adequate for new install. 5. Install 6 thick concrete at 3000 psi 6. Safety fence to be installed by contractor when work begins and removed
- Status
- Closed
- Sector
- Manufacturing (Industrial), Commercial, Cement, Government
- Location
- Anderson, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about ACSDF TL Hanna Front Entrance Improvements REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Location: TL Hanna Front Entrance 1. Approx ~ 160 ft x 40 ft (Contractor responsible for exact measurement). 2. Remove damaged concrete (see page 4). 3. Contractor is responsible for disposing of all concrete removed. 4. Contractor to ensure base material is adequate for new install. 5. Install 6 thick concrete at 3000 psi 6. Safety fence to be installed by contractor when work begins and removed by contractor when work is complete. Exact locations of fence will be determined by the contracto... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Anderson |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Cement, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- CR 275/RIVER ROAD FROM SR 65 TO CR 11/SLASH ROAD
- SOUTH VALDOSTA TRUCK BYPASS
- CR 92/WRIGHTS MILL ROAD @ HUDSON RIVER 7.3 MI SE OF HOMER
- BRIDGE PRESERVATION @ 7 LOCS IN CLARKE & WALTON COUNTY
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
- CR 526/OLD MACON RD FM EVERGREEN RD TO WILKINSON COUNTY LINE
- SR 7/US 341 @ SR 74
- ASHFORD-DUNWOODY ROAD EB RAMP @ I-285
