Activ Priozernaya Solar Plant
Sector: Solar • Location: Ukraine
Source: World Bank Group
Activ Solar GmbH, registered in Austria, was planning the development of the 54.8MW Priozernaya solar plant. The project consisted of 227,744 solar PV modules (crystalline), ground mounted, four row on 100 hectares of land.
The project was commissioned in March 2013, but reported as under development here as no financial closure date was available and commissioning date was >2012. Ukraine mainta
- Status
- Prospective
- Sector
- Solar, Commercial, Power Generation (CCGT), Power Transmission, Government
- Location
- Ukraine
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Activ Priozernaya Solar Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Activ Solar GmbH, registered in Austria, was planning the development of the 54.8MW Priozernaya solar plant. The project consisted of 227,744 solar PV modules (crystalline), ground mounted, four row on 100 hectares of land. The project was commissioned in March 2013, but reported as under development here as no financial closure date was available and commissioning date was >2012. Ukraine maintained a feed-in tariff of UAH4.8 (US$0.58) for solar plants in until 2012, when it was cut to UAH 3.5 (US$0.43). The price is guaranteed until 2030. The tariff is paid in UAH, but guaranteed against a fixed EUR amount (pegged), to absorb currency risk. The national utility is named Electricity Company Ukraine. No financial details were available. Financial closure date was unavailable, estimated here at December 2012. activsolar.com |
Original sector | Energy |
Location
Country | Ukraine |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Solar, Commercial, Power Generation (CCGT), Power Transmission, Government |
Article published date | 2024-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
