Active Living Trail Phase 2
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Approximate major quantities for the Work include: 1171 CU YD Common Excavation (EV) (P) 361 CU YD Common Embankment (CV) (P) 3291 SQ YD Geotextile Fabric Type 7 (non-woven) 752 CU YD Aggregate Base Class 5 (CV) (P) 734 TON Type SP 9.5 Wearing Course Mix (2,B) 319 LIN FT 8 HDPE Pipe Sewer 684 LIN FT 10 HDPE Pipe Sewer 28.4 LIN FT Construct Drainage Structure Design Special 2 226 SQ FT 4 Concrete W
- Status
- Prospective
- Sector
- Car parking, Cement, Water Supply and Storage, Waste Processing and Treatment, Manufacturing (Industrial), Electric Vehicles (EVs), Mass Transit, Automotive, Rail, Government, Commercial, Power Generation (CCGT)
- Location
- Olivia, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Active Living Trail Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Approximate major quantities for the Work include: 1171 CU YD Common Excavation (EV) (P) 361 CU YD Common Embankment (CV) (P) 3291 SQ YD Geotextile Fabric Type 7 (non-woven) 752 CU YD Aggregate Base Class 5 (CV) (P) 734 TON Type SP 9.5 Wearing Course Mix (2,B) 319 LIN FT 8 HDPE Pipe Sewer 684 LIN FT 10 HDPE Pipe Sewer 28.4 LIN FT Construct Drainage Structure Design Special 2 226 SQ FT 4 Concrete Walk 467 SQ FT 6 Concrete Walk (Pedestrian Ramps & Landing Areas) 66 LIN FT Concrete Curb & Gutter... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Olivia |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Cement, Water Supply and Storage, Waste Processing and Treatment, Manufacturing (Industrial), Electric Vehicles (EVs), Mass Transit, Automotive, Rail, Government, Commercial, Power Generation (CCGT) |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
