logo
ProjectActive

Active Perovo Solar Plant

Active · Ukraine

Source: World Bank Group

Activ Solar was planning the development of the 105.6 MW Perovo solar PV plant, in Perovo, Crimea. The project was planned to comprise 88,000 modules, producing 26.5 GWh annually. Activ Solar Holding GmbH was an Austrian developer with a number of local Ukrainian subsidiaries and SPVs: Crimea Solar 1, Crimea Solar 2, Crimea Solar 3, Crimea Solar 4, and Crimea Solar 5, as well as solar PV producer

Status
Prospective
Sector
Advanced Electronics, Power Generation (CCGT), Solar, Commercial, Government
Location
Ukraine
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Active Perovo Solar Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Active Perovo Solar Plant” is an infrastructure initiative in the Advanced Electronics sector, located in Ukraine. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Activ Solar was planning the development of the 105.6 MW Perovo solar PV plant, in Perovo, Crimea. The project was planned to comprise 88,000 modules, producing 26.5 GWh annually. Activ Solar Holding GmbH was an Austrian developer with a number of local Ukrainian subsidiaries and SPVs: Crimea Solar 1, Crimea Solar 2, Crimea Solar 3, Crimea Solar 4, and Crimea Solar 5, as well as solar PV producer CHAO Zavod poluprovodnikov Zaporozhye (75%) and silicon producer OJSC Semiconductor Plant (a demerger of former-Soviet ZTMC). Ownership Activ Solar Holding GmbH, formally owned by Liechtenstein registered P&A Corporate Trust, was a sister company of Slav AG. As of November 2011, CEO of Activ Solar was Mr. Kaveh Ertefai. Commissioning was expected in 2011. The initial 20 MW was announced as the first phase and formally registered as OOO Omao Solar. This project was one of three projects under development by Activ Solar in 2011, the other two being the 7.5 MW Rodnikovoye and the 60 MW Ohotnikovo solar PV plants. Production license was announced in July 2011, for 20 years. The land was leased for 49 years. The Ukraine passed a Feed-in Tarrif bill in April 2009. The bill also included a minimum euro-denominated electricity price intended to mitigate exchange rate risk, as well as a domestic-content obligation. The project was compelted in December 2011. Total project size reached 105.56MW and consisted of 440,000 PV modules producing 132.5GWh annually. As of October 2011, no details about the financial structure of the projects was available. The project was reported as having 30-40% of total cost in equity. The remainder in debt funded by VTB Bank OJSC (BTBR) and Sberbank of Russia (SBER). Total project cost was estimated based on $3.9 million/MW, the average price of solar plants in ECA (2011): $411.84 million. http://www.cleanenergyactionproject.com/CleanEnergyActionProject/CS.Perovo_Solar_Power_Station___Silicon_Photovoltaic_Solar_Power_Case_Studies.html

Original sector

Energy

Budget

Location

Country

Ukraine

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Advanced Electronics, Power Generation (CCGT), Solar, Commercial, Government

Article published date

2024-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project