logo

Active Traffic Management Study

Sector: Advanced Electronics • Location: Washington, United States of America (USA)

Source: Federal Highway Administration (FHWA)

Project
Completed

This project determined both the comprehension of the active traffic management (ATM) signs as well as the legibility distance of these signs, and determined how motorists respond to these signs in a simulated driving environment. This final report describes a series of experiments that developed alternative signs focusing on dynamic lane assignment and variable speed limits and used the deploymen

Project Information FAQ

Project Information

5 Q
The project “Active Traffic Management Study” is an infrastructure initiative in the Advanced Electronics sector, located in Washington, United States of America (USA). Taiyo aggregates data on it from Federal Highway Administration (FHWA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project determined both the comprehension of the active traffic management (ATM) signs as well as the legibility distance of these signs, and determined how motorists respond to these signs in a simulated driving environment. This final report describes a series of experiments that developed alternative signs focusing on dynamic lane assignment and variable speed limits and used the deployments in Minnesota and Washington as one of the inputs to sign development. Laboratory and field studies determined both the comprehension of the ATM signs as well as their respective legibility distances. Two driving simulator studies helped determine how motorists respond to these signs in a simulated driving environment.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data