logo

Active Transportation Pedestrian Bridge and Light Crossings for St. Andrews, MB

Sector: Bridge • Location: Canada

Source: Manitoba

Project
Prospective

"Install a pedestrian bridge and pedestrian light crossings for our newly installed trail system. The RM of St. Andrews has ambitious plans and is currently developing an Active Transportation corridor along Manitoba Provincial Trunk Highway 9 (PT-9). Trail installation started in fall of 2020 and continued in spring 2021 by installing 4 kms of trail from St. Andrews Road heading south to Hwy #27

Project Information FAQ

Project Information

5 Q
The project “Active Transportation Pedestrian Bridge and Light Crossings for St. Andrews, MB” is an infrastructure initiative in the Bridge sector, located in Canada. Taiyo aggregates data on it from Manitoba.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

prospective

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

"Install a pedestrian bridge and pedestrian light crossings for our newly installed trail system. The RM of St. Andrews has ambitious plans and is currently developing an Active Transportation corridor along Manitoba Provincial Trunk Highway 9 (PT-9). Trail installation started in fall of 2020 and continued in spring 2021 by installing 4 kms of trail from St. Andrews Road heading south to Hwy #27 on the east side of the highway. An additional 4 kms of trail are being installed this spring from St. Andrews Road heading north to Lower Fort Garry Historic site. Another 1.5 kms of trail is planned to be installed in 2023 which will be installed on the west side of the highway from Hwy #27 to Parks Creek which would then put us at the border of West St. Paul, but with the creek in between. West St. Paul is committed to bring their trail system the remainder of the way to the creek on their side. This would then leave the two trails in each municipality unconnected. The RM of St. Andrews is prepared to install a pedestrian bridge over the creek in order to connect the two communities which would then enable the RM of St. Andrews and WSP to connect all the way to St. Clements, as well as Selkirk and provide WSP with the ability to then be connected to the Canada Trail system and all the municipalities to be able to connect to the City of Winnipeg."

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data