Active Transportation Pedestrian Bridge and Light Crossings for St. Andrews, MB
Sector: Bridge • Location: Canada
Source: Manitoba
"Install a pedestrian bridge and pedestrian light crossings for our newly installed trail system. The RM of St. Andrews has ambitious plans and is currently developing an Active Transportation corridor along Manitoba Provincial Trunk Highway 9 (PT-9). Trail installation started in fall of 2020 and continued in spring 2021 by installing 4 kms of trail from St. Andrews Road heading south to Hwy #27
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | prospective |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | "Install a pedestrian bridge and pedestrian light crossings for our newly installed trail system. The RM of St. Andrews has ambitious plans and is currently developing an Active Transportation corridor along Manitoba Provincial Trunk Highway 9 (PT-9). Trail installation started in fall of 2020 and continued in spring 2021 by installing 4 kms of trail from St. Andrews Road heading south to Hwy #27 on the east side of the highway. An additional 4 kms of trail are being installed this spring from St. Andrews Road heading north to Lower Fort Garry Historic site. Another 1.5 kms of trail is planned to be installed in 2023 which will be installed on the west side of the highway from Hwy #27 to Parks Creek which would then put us at the border of West St. Paul, but with the creek in between. West St. Paul is committed to bring their trail system the remainder of the way to the creek on their side. This would then leave the two trails in each municipality unconnected. The RM of St. Andrews is prepared to install a pedestrian bridge over the creek in order to connect the two communities which would then enable the RM of St. Andrews and WSP to connect all the way to St. Clements, as well as Selkirk and provide WSP with the ability to then be connected to the Canada Trail system and all the municipalities to be able to connect to the City of Winnipeg." |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
