Active Transportation Pedestrian Bridge and Light Crossings for St. Andrews, MB
Sector: Bridge • Location: Manitoba, Canada
Source: Infrastructure Canada
"Install a pedestrian bridge and pedestrian light crossings for our newly installed trail system. The RM of St. Andrews has ambitious plans and is currently developing an Active Transportation corridor along Manitoba Provincial Trunk Highway 9 (PT-9). Trail installation started in fall of 2020 and continued in spring 2021 by installing 4 kms of trail from St. Andrews Road heading south to Hwy #27
- Status
- Prospective
- Sector
- Bridge, Road, Government
- Location
- Manitoba, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Active Transportation Pedestrian Bridge and Light Crossings for St. Andrews, MB
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | pre-construction |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | "Install a pedestrian bridge and pedestrian light crossings for our newly installed trail system. The RM of St. Andrews has ambitious plans and is currently developing an Active Transportation corridor along Manitoba Provincial Trunk Highway 9 (PT-9). Trail installation started in fall of 2020 and continued in spring 2021 by installing 4 kms of trail from St. Andrews Road heading south to Hwy #27 on the east side of the highway. An additional 4 kms of trail are being installed this spring from St. Andrews Road heading north to Lower Fort Garry Historic site. Another 1.5 kms of trail is planned to be installed in 2023 which will be installed on the west side of the highway from Hwy #27 to Parks Creek which would then put us at the border of West St. Paul, but with the creek in between. West St. Paul is committed to bring their trail system the remainder of the way to the creek on their side. This would then leave the two trails in each municipality unconnected. The RM of St. Andrews is prepared to install a pedestrian bridge over the creek in order to connect the two communities which would then enable the RM of St. Andrews and WSP to connect all the way to St. Clements, as well as Selkirk and provide WSP with the ability to then be connected to the Canada Trail system and all the municipalities to be able to connect to the City of Winnipeg." |
Original sector | Active Transportation |
Budget |
Location
Country | Canada |
State | Manitoba |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Bridge, Road, Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in Canada
- Reconstruction of the Île-aux-Tourtes Bridge that connects Montreal and the province of Ontario (Canada)
- Forrest Kerr Hydroelectric Project British Columbia
- Highway Rehab -- Bridge replacement Hallecks Rd., Lyn Rd., United Counties of Leeds and Grenville
- Highway Rehab -- Bridge rehabilitation Stewart Blvd. underpass, North Augusta Rd., underpass, Brockville
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Bridge rehabilitation, Culvert replacement 0.8 km west of Hwy 573 easterly to junction of Hwy 11, Englehart
- Highway Rehab -- Bridge rehabilitation, Resurfacing Hwy 427 to Kipling Ave., Hwy 401 west to Dixon Rd., Toronto
- Highway Rehab -- Bridge replacement Kasabonika Modular Bridge, Kasabonika Remote Northern Airport
- Highway Rehab -- Bridge replacement Grassy Lake Bridge, north of River Valley
