Active Transportation, Urban Section, Grand-Sault, New Brunswick
Sector: Road • Location: New Brunswick, Canada
Source: Infrastructure Canada
The two major objectives of this project are to improve the safety of the urban pathway (4.8 km) and to make it more accessible for recreational hikers, of course, and for those who would like to use it to run errands or commute to work. To achieve these two objectives, the path needs to be widened and equipped with proper signage. The path will be widened from 2.4 m (8 ft.) to 3.1 m (10 ft.) alon
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The two major objectives of this project are to improve the safety of the urban pathway (4.8 km) and to make it more accessible for recreational hikers, of course, and for those who would like to use it to run errands or commute to work. To achieve these two objectives, the path needs to be widened and equipped with proper signage. The path will be widened from 2.4 m (8 ft.) to 3.1 m (10 ft.) along its entire route. As noted earlier, this change is needed to reduce the potential for pedestrian/bicycle collisions and, at the same time, reduce the stress of congestion due to the narrowness of the current pathway. It is important for both cyclists and pedestrians to have their own lane in both directions. Proper signage should facilitate the achievement of the safety objective and promote active transportation. Once the path is safer, it will become more accessible to all users, including those with mobility impairments who use wheelchairs. See pages 8 to 16 of the main document for a more detailed description of the project, its challenges, the steps to its implementation, and its benefits. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
