logo

Active Transportation, Urban Section, Grand-Sault, New Brunswick

Sector: Road • Location: New Brunswick, Canada

Source: Infrastructure Canada

Project
Completed

The two major objectives of this project are to improve the safety of the urban pathway (4.8 km) and to make it more accessible for recreational hikers, of course, and for those who would like to use it to run errands or commute to work. To achieve these two objectives, the path needs to be widened and equipped with proper signage. The path will be widened from 2.4 m (8 ft.) to 3.1 m (10 ft.) alon

Status
Closed
Sector
Road, Government
Location
New Brunswick, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Active Transportation, Urban Section, Grand-Sault, New Brunswick

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Active Transportation, Urban Section, Grand-Sault, New Brunswick” is an infrastructure initiative in the Road sector, located in New Brunswick, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The two major objectives of this project are to improve the safety of the urban pathway (4.8 km) and to make it more accessible for recreational hikers, of course, and for those who would like to use it to run errands or commute to work. To achieve these two objectives, the path needs to be widened and equipped with proper signage. The path will be widened from 2.4 m (8 ft.) to 3.1 m (10 ft.) along its entire route. As noted earlier, this change is needed to reduce the potential for pedestrian/bicycle collisions and, at the same time, reduce the stress of congestion due to the narrowness of the current pathway. It is important for both cyclists and pedestrians to have their own lane in both directions. Proper signage should facilitate the achievement of the safety objective and promote active transportation. Once the path is safer, it will become more accessible to all users, including those with mobility impairments who use wheelchairs. See pages 8 to 16 of the main document for a more detailed description of the project, its challenges, the steps to its implementation, and its benefits.

Original sector

Active Transportation

Location

Country

Canada

State

New Brunswick

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Road, Government

Article published date

2025-11-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project