Actively Managed-Express-Building Construction:2288/Fenton
The status, timeline and source of this project. A free account opens every field.
Source: City of San Diego Development Permits
MISSION VALLEY. Master Plan Establishment of 6 plan types (A-F) for a tenant improvement of 123 existing apartment units located throughout 18 existing apartment buildings on site. Work includes remodeling kitchen and bathrooms, replacing existing hallway and entry ceiling light fixtures, master bedroom ceiling fans, replacing electrical receptacles.
- Status
- Prospective
- Sector
- Commercial, Residential
- Location
- San Diego, United States of America
- Updated
- 19 Nov 2026
- Source
- City of San Diego Development Permits
ConstructChat
Ask ConstructChat about Actively Managed-Express-Building Construction:2288/Fenton
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | issued |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | MISSION VALLEY. Master Plan Establishment of 6 plan types (A-F) for a tenant improvement of 123 existing apartment units located throughout 18 existing apartment buildings on site. Work includes remodeling kitchen and bathrooms, replacing existing hallway and entry ceiling light fixtures, master bedroom ceiling fans, replacing electrical receptacles. |
Original sector | Add/Alt 3+, No Chg DU |
Location
Country | United States of America (USA) |
City | San Diego |
Source
Source | City of San Diego Development Permits |
URL |
More Details
Record type | Project |
Sector | Commercial, Residential |
Article published date | 2026-04-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
