ACUA Landfill Final Cap - Phase 2
Sector: Water Supply and Storage • Location: Egg Harbor Township, New Jersey, United States of America
Source: Dodge USA
Construction of a final cap system on a portion of the ACUA Landfill located at the ACUA Hanemann Environmental Park in Egg Harbor Township, NJ. The work includes, but is not limited to removal of existing vegetation, earthwork, installation of a final cap system including a geosynthetic lining system, soil cover, and final vegetation, stormwater conveyance system construction, gas and leachate co
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bidding |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Construction of a final cap system on a portion of the ACUA Landfill located at the ACUA Hanemann Environmental Park in Egg Harbor Township, NJ. The work includes, but is not limited to removal of existing vegetation, earthwork, installation of a final cap system including a geosynthetic lining system, soil cover, and final vegetation, stormwater conveyance system construction, gas and leachate collection system installation, access road construction, and all associated work. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
