ACWA Beech Grove Lane Waterline Replacements REBID
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The project is a public works project, intended to better serve the customers of ACWA by replacing deteriorating waterline with new, polyvinyl chloride PVC waterline. The project involves the installation of approximately 5,400 linear feet L.F. of 2-inch waterline and approximately 11,000 L.F. of 6-inch waterline PVC and Ductile Iron, to the parameters generally shown in the plans, and in accordan
- Status
- Closed
- Sector
- Metal, Water Supply and Storage, Road, Government, Steel, Commercial, Waste Processing and Treatment
- Location
- Rocky Top, Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about ACWA Beech Grove Lane Waterline Replacements REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is a public works project, intended to better serve the customers of ACWA by replacing deteriorating waterline with new, polyvinyl chloride PVC waterline. The project involves the installation of approximately 5,400 linear feet L.F. of 2-inch waterline and approximately 11,000 L.F. of 6-inch waterline PVC and Ductile Iron, to the parameters generally shown in the plans, and in accordance with the specifications. The project also involves installing new water services and reconnect... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Rocky Top |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Water Supply and Storage, Road, Government, Steel, Commercial, Waste Processing and Treatment |
Article published date | 2024-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- Shivwits Band of Paiutes Fiber Ring Connectivity Project
- PARTIAL METAL BEAM REPLACEMENT DUE TO FIRE DAMAGE, ROOF REPLACEMENT WORK DUE TO FIRE DAMAGE
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- TO CONSTRUCT 15,000 SF PRE-FAB METAL BUILDING AND ASSOCIATED SITE IMPROVEMENTS (1069 & 1089 INDUSTRIAL)
- Willard InterContinental Hotel
- Pacific Visions Wing at the Aquarium of the Pacific
