logo

ACWA Power Jordan

Sector: Waste Processing and Treatment • Location: Jordan

Source: International Finance Corporation (IFC)

Project
Active

IFC is considering an equity investment alongside International Company for Water and Power Projects (trade name ACWA Power International (“ACWA Power”)) to collectively acquire a 65% stake in ENARA, 51% owner of the Central Electricity Generating Company (“CEGCO”). CEGCO is Jordan’s largest power generation company with a total installed capacity of around 1,500 MW representing circa 59% of Jorda

Project Information FAQ

Project Information

4 Q
The project “ACWA Power Jordan” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Jordan. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

IFC is considering an equity investment alongside International Company for Water and Power Projects (trade name ACWA Power International (“ACWA Power”)) to collectively acquire a 65% stake in ENARA, 51% owner of the Central Electricity Generating Company (“CEGCO”). CEGCO is Jordan’s largest power generation company with a total installed capacity of around 1,500 MW representing circa 59% of Jordan’s installed capacity. It owns and operates seven power plants across Jordan playing a critical role in securing Jordan’s electricity supply capitalizing on the assets’ fuel flexibility. CEGCO’s power plants currently sell power to the National Electricity Power Company, government owned transmission company and single buyer under the Power Purchase Agreements (“PPAs”). The acquisition of the 65% stake in ENARA will be subject to several conditions precedent, as is customary in a transaction of this nature, including a consent from the Government of Jordan.In addition to running CEGCO’s plants in accordance with the existing PPAs, ACWA Power plans to improve overall assets’ efficiency whilst extending the terms of the existing PPAs. It will further contemplate re-powering selected plants based on the technical and environmental feasibility adding capacity at a relatively lower cost than a Greenfield power plant.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data