ACWA Power Zarqa Thermal Power Station
Sector: Bridge • Location: Jordan
Source: International Finance Corporation (IFC)
Please provide a general and brief description of the project.The project consists of the design, construction, ownership and operation of a 485MW combined cycle gas fired power plant located in the Zarqa Industrial Zone, the Hashemite Kingdom of Jordan (the “Project”). The Project will replace one of the oldest and most inefficient power plants in Jordan (which is currently being decommissioned)
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Please provide a general and brief description of the project.The project consists of the design, construction, ownership and operation of a 485MW combined cycle gas fired power plant located in the Zarqa Industrial Zone, the Hashemite Kingdom of Jordan (the “Project”). The Project will replace one of the oldest and most inefficient power plants in Jordan (which is currently being decommissioned) with a more efficient power plant and should therefore help bridge the country’s anticipated power generation deficit while increasing the capacity and efficiency of the existing 30 year old power plant in a cost competitive way.The proposed Project is expected to cost approx. US$475 million and will be financed by 75:25 debt to equity. The proposed IFC investment consists of an A-loan of up to US$75 million. IFC will also help to mobilize up to approx. US$200 million of debt.The Project is being developed by ACWA Power, through its investment holding company Red Sea Energy. ACWA Power has engaged discussions for Kingdom Electricity Company (“KEC”) to join as a 33% shareholder in the project company on or close to financial closing.ACWA Power and its E&S consulting company (5 Capitals) prepared the ESIA documents for submission to the Jordanian Ministry of Environment :Hussein TPS Power Generation Project, Zarqa, Jordan, Environmental and Social Impact Assessment, Volume 1 – Non-Technical Summary, April 2016Arabic version of the Volume 1Hussein TPS Power Generation Project, Zarqa, Jordan, Environmental and Social Impact Assessment, Volume 2 – Main text, Table, Figures & Plates, April 2016Hussein TPS Power Generation Project, Zarqa, Jordan, Environmental and Social Impact Assessment, Volume 3 – Outline Environmental & Social Management and Monitoring Plan, April 2016Hussein TPS Power Generation Project, Zarqa, Jordan, Environmental and Social Impact Assessment, Volume 4 – Appendices, April 2016IFC received this package of the ESIA from ACWA Power on April 26, 2016. After conducting the IFC’s E&S appraisal, IFC will disclose IFC’s Environmental and Social Review Summary at a later date. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
