logo

ACWA Power Zarqa Thermal Power Station

Sector: Bridge • Location: Jordan

Source: International Finance Corporation (IFC)

Project
Active

Please provide a general and brief description of the project.The project consists of the design, construction, ownership and operation of a 485MW combined cycle gas fired power plant located in the Zarqa Industrial Zone, the Hashemite Kingdom of Jordan (the “Project”). The Project will replace one of the oldest and most inefficient power plants in Jordan (which is currently being decommissioned)

Project Information FAQ

Project Information

4 Q
The project “ACWA Power Zarqa Thermal Power Station” is an infrastructure initiative in the Bridge sector, located in Jordan. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Please provide a general and brief description of the project.The project consists of the design, construction, ownership and operation of a 485MW combined cycle gas fired power plant located in the Zarqa Industrial Zone, the Hashemite Kingdom of Jordan (the “Project”). The Project will replace one of the oldest and most inefficient power plants in Jordan (which is currently being decommissioned) with a more efficient power plant and should therefore help bridge the country’s anticipated power generation deficit while increasing the capacity and efficiency of the existing 30 year old power plant in a cost competitive way.The proposed Project is expected to cost approx. US$475 million and will be financed by 75:25 debt to equity. The proposed IFC investment consists of an A-loan of up to US$75 million. IFC will also help to mobilize up to approx. US$200 million of debt.The Project is being developed by ACWA Power, through its investment holding company Red Sea Energy. ACWA Power has engaged discussions for Kingdom Electricity Company (“KEC”) to join as a 33% shareholder in the project company on or close to financial closing.ACWA Power and its E&S consulting company (5 Capitals) prepared the ESIA documents for submission to the Jordanian Ministry of Environment :Hussein TPS Power Generation Project, Zarqa, Jordan, Environmental and Social Impact Assessment, Volume 1 – Non-Technical Summary, April 2016Arabic version of the Volume 1Hussein TPS Power Generation Project, Zarqa, Jordan, Environmental and Social Impact Assessment, Volume 2 – Main text, Table, Figures & Plates, April 2016Hussein TPS Power Generation Project, Zarqa, Jordan, Environmental and Social Impact Assessment, Volume 3 – Outline Environmental & Social Management and Monitoring Plan, April 2016Hussein TPS Power Generation Project, Zarqa, Jordan, Environmental and Social Impact Assessment, Volume 4 – Appendices, April 2016IFC received this package of the ESIA from ACWA Power on April 26, 2016. After conducting the IFC’s E&S appraisal, IFC will disclose IFC’s Environmental and Social Review Summary at a later date.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data