AD Hydro Power Limited

Sector: Tunnel • Location: India

Source: International Finance Corporation (IFC)

Project
Completed

The project is a 192 MW run-of-river hydropower project in the Kullu Valley of India’s Himachal Pradesh State. The project consists of a high-head power plant that utilizes flows from a combination of glacial snow melt and monsoon rains to supply peaking reservoirs via tunnels from the catchment basins of the Allain and Duhangan rivers. The project will divert a portion of the flow of the two r

Project Information FAQ

Project Information

4 Q
The project “AD Hydro Power Limited” is an infrastructure initiative in the Tunnel sector, located in India. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project is a 192 MW run-of-river hydropower project in the Kullu Valley of India’s Himachal Pradesh State. The project consists of a high-head power plant that utilizes flows from a combination of glacial snow melt and monsoon rains to supply peaking reservoirs via tunnels from the catchment basins of the Allain and Duhangan rivers. The project will divert a portion of the flow of the two rivers via a steel-lined pressure shaft tunnel to feed a single subterranean powerhouse equipped with two 96 MW Pelton turbines. The setting for the project is the steep terrain of the Himalayas with the diversion dams on the two rivers. Water is returned to the Allain River via a tailrace downstream from the powerhouse. Power is evacuated to the regional grid from an outdoor switchyard via a 185 km transmission line. The project has been developed to meet the projected increase in the demand for electricity throughout northern India in the next decade, and it is consistent with the Government of India’s goal to double the existing percentage of electricity generated from renewable sources, especially hydropower. The ESIA documentation was prepared by Environmental Resource Management (ERM) Pvt. Ltd. over a period between January 2003 and September 2004. During that time, the consultants and representatives of the project Sponsor undertook extensive consultation with the project-affected population on a family and group basis. The chronology of the public disclosure process for the project is given on page56 of the Addendum to the ESIA.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data