logo
ProjectCompleted

AD Hydro Power Limited

Completed · India

Source: International Finance Corporation (IFC)

The project is a 192 MW run-of-river hydropower project in the Kullu Valley of India’s Himachal Pradesh State. The project consists of a high-head power plant that utilizes flows from a combination of glacial snow melt and monsoon rains to supply peaking reservoirs via tunnels from the catchment basins of the Allain and Duhangan rivers. The project will divert a portion of the flow of the two r

Status
Closed
Sector
Tunnel, Power Generation (CCGT), Water Supply and Storage, Hydro, Steel, Government, Metal
Location
India
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about AD Hydro Power Limited

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “AD Hydro Power Limited” is an infrastructure initiative in the Tunnel sector, located in India. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project is a 192 MW run-of-river hydropower project in the Kullu Valley of India’s Himachal Pradesh State. The project consists of a high-head power plant that utilizes flows from a combination of glacial snow melt and monsoon rains to supply peaking reservoirs via tunnels from the catchment basins of the Allain and Duhangan rivers. The project will divert a portion of the flow of the two rivers via a steel-lined pressure shaft tunnel to feed a single subterranean powerhouse equipped with two 96 MW Pelton turbines. The setting for the project is the steep terrain of the Himalayas with the diversion dams on the two rivers. Water is returned to the Allain River via a tailrace downstream from the powerhouse. Power is evacuated to the regional grid from an outdoor switchyard via a 185 km transmission line. The project has been developed to meet the projected increase in the demand for electricity throughout northern India in the next decade, and it is consistent with the Government of India’s goal to double the existing percentage of electricity generated from renewable sources, especially hydropower. The ESIA documentation was prepared by Environmental Resource Management (ERM) Pvt. Ltd. over a period between January 2003 and September 2004. During that time, the consultants and representatives of the project Sponsor undertook extensive consultation with the project-affected population on a family and group basis. The chronology of the public disclosure process for the project is given on page56 of the Addendum to the ESIA.

Original sector

BA - Large Hydro - Renewable Energy Generation

Location

Country

India

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Tunnel, Power Generation (CCGT), Water Supply and Storage, Hydro, Steel, Government, Metal

Article published date

2025-08-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project