The project is a 192 MW run-of-river hydropower project in the Kullu Valley of India’s Himachal Pradesh State. The project consists of a high-head power plant that utilizes flows from a combination of glacial snow melt and monsoon rains to supply peaking reservoirs via tunnels from the catchment basins of the Allain and Duhangan rivers. The project will divert a portion of the flow of the two r
- Status
- Closed
- Sector
- Tunnel, Power Generation (CCGT), Water Supply and Storage, Hydro, Steel, Government, Metal
- Location
- India
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about AD Hydro Power Limited
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is a 192 MW run-of-river hydropower project in the Kullu Valley of India’s Himachal Pradesh State. The project consists of a high-head power plant that utilizes flows from a combination of glacial snow melt and monsoon rains to supply peaking reservoirs via tunnels from the catchment basins of the Allain and Duhangan rivers. The project will divert a portion of the flow of the two rivers via a steel-lined pressure shaft tunnel to feed a single subterranean powerhouse equipped with two 96 MW Pelton turbines. The setting for the project is the steep terrain of the Himalayas with the diversion dams on the two rivers. Water is returned to the Allain River via a tailrace downstream from the powerhouse. Power is evacuated to the regional grid from an outdoor switchyard via a 185 km transmission line. The project has been developed to meet the projected increase in the demand for electricity throughout northern India in the next decade, and it is consistent with the Government of India’s goal to double the existing percentage of electricity generated from renewable sources, especially hydropower. The ESIA documentation was prepared by Environmental Resource Management (ERM) Pvt. Ltd. over a period between January 2003 and September 2004. During that time, the consultants and representatives of the project Sponsor undertook extensive consultation with the project-affected population on a family and group basis. The chronology of the public disclosure process for the project is given on page56 of the Addendum to the ESIA. |
Original sector | BA - Large Hydro - Renewable Energy Generation |
Location
Country | India |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Tunnel, Power Generation (CCGT), Water Supply and Storage, Hydro, Steel, Government, Metal |
Article published date | 2025-08-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Tunnel projects in India
- Kiru Hydroelectric Project Jammu and Kashmir India
- Chuzachen Hydroelectric Power Project Sikkim
- Rampur Hydro Electric Power Project Himachal Pradesh
- UriII Hydroelectric Project Jammu and Kashmir
- Nathpa Jhakri India Hydroelectric Power Plant
- Lower Subansiri Hydroelectric Power Project
- Khambatki Ghat Tunnel & Road
- Oriental Nagpur Betul Highway Private Limited