ADA Highway Sidewalk Improvements
Sector: Cement • Location: Farmington, Missouri, United States of America
Source: Dodge USA
The Scope of Work includes sidewalk improvements to Highway H within the City of Farmington and provides for concrete sidewalks and ADA ramps, concrete approach, concrete curb and gutter, storm sewer improvements, pavement striping, traffic control and other incidental items and work described in the Project Manual, or reasonably inferable therefrom. Farmington, Missouri anticipates issuing notice
- Status
- Closed
- Sector
- Cement, Car parking, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Automotive, Commercial
- Location
- Farmington, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about ADA Highway Sidewalk Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Scope of Work includes sidewalk improvements to Highway H within the City of Farmington and provides for concrete sidewalks and ADA ramps, concrete approach, concrete curb and gutter, storm sewer improvements, pavement striping, traffic control and other incidental items and work described in the Project Manual, or reasonably inferable therefrom. Farmington, Missouri anticipates issuing notice to proceed in the early spring of 2025, weather permitting. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Farmington |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Car parking, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Automotive, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
