logo
ProjectBidding

Ada Township Thornapple River Pedestrian Bridge

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

The Project includes construction of a three-span prefabricated steel bridge crossing the Thornapple River just downstream from the existing Thornapple River Drive vehicular bridge. The bridge will have two spans that are 50 feet long and the center span will be 170 feet long. The project also includes construction of 165 feet of wood boardwalk, 5,035 square feet of concrete pavement, and roughly

Status
Prospective
Sector
Road, Bridge, Commercial, Car parking, Automotive, Steel, Government, Cement, Metal
Location
Forest Hills, Michigan, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Ada Township Thornapple River Pedestrian Bridge

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Ada Township Thornapple River Pedestrian Bridge” is an infrastructure initiative in the Road sector, located in Forest Hills, Michigan, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project includes construction of a three-span prefabricated steel bridge crossing the Thornapple River just downstream from the existing Thornapple River Drive vehicular bridge. The bridge will have two spans that are 50 feet long and the center span will be 170 feet long. The project also includes construction of 165 feet of wood boardwalk, 5,035 square feet of concrete pavement, and roughly 2,000 cubic yards of embankment

Procurement method

Budget

Location

Country

United States of America (USA)

State

Michigan

City

Forest Hills

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Road, Bridge, Commercial, Car parking, Automotive, Steel, Government, Cement, Metal

Article published date

2025-08-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project