ADAL Communications Bldg 210 Construction SOURCES SOUGHT
Closed · Oregon · Last reported Oct 2024
Source: Dodge USA
ADAL Communications Bldg 210 Construction -- The project intent is to add/alter Building 210 (communications facility) for expanded mission requirements. This will increase the sq ft by 6,217 from 3,428 to 9,645 total sq ft. This addition to B210 will include space for all Comm Squadron members, vault, and communications infrastructure. Alterations to existing building include new openings to addi
- Status
- Closed
- Sector
- Power Generation (CCGT), Manufacturing (Industrial), Commercial, Telecommunications
- Location
- Klamath Falls, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about ADAL Communications Bldg 210 Construction SOURCES SOUGHT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | ADAL Communications Bldg 210 Construction -- The project intent is to add/alter Building 210 (communications facility) for expanded mission requirements. This will increase the sq ft by 6,217 from 3,428 to 9,645 total sq ft. This addition to B210 will include space for all Comm Squadron members, vault, and communications infrastructure. Alterations to existing building include new openings to addition, HAZ-MAT testing and removal, Mechanical, Electrical, Plumbing, and Telecom. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
City | Klamath Falls |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Manufacturing (Industrial), Commercial, Telecommunications |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
