Adams Solar PV 2
Sector: Solar • Location: South Africa
Source: World Bank Group
The 82.5MW Adams Solar PV 2 reached financial closure, as Enel began construction in March 2015. This BOO project estimated at US$109.6 million (based on 82.5 MW Paleisheuwel) would entail the development of solar pv power plant, located near Hotazel, Northern Cape. It was a part of Window 3 of the Renewable Energy Independent Power Producer Procurement Programme (REIPPPP) by Department of Energy
- Status
- Prospective
- Sector
- Solar, Power Transmission, Wind, Raw Materials, Power Generation (CCGT), Government, Commercial
- Location
- South Africa
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Adams Solar PV 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The 82.5MW Adams Solar PV 2 reached financial closure, as Enel began construction in March 2015. This BOO project estimated at US$109.6 million (based on 82.5 MW Paleisheuwel) would entail the development of solar pv power plant, located near Hotazel, Northern Cape. It was a part of Window 3 of the Renewable Energy Independent Power Producer Procurement Programme (REIPPPP) by Department of Energy (DoE). The project company was Adams Solar PV Project Two Pty Ltd composed of Hotazel Community Trust (10%), Lisinfo245 Investments (Pty) Ltd (30%, wholly owned by Royal Bafokeng Nation Development Trust) EGP SA BV(60%, wholly owned by EGP SPA). The energy generated by this new wind farm would be sold to the South African utility Eskom through a 20-year power supply agreement. http://www.nersa.org.za/Admin/Document/Editor/file/Consultations/Electricity/Presentations/Adams%20Solar%20PV%20%20Project.pdf Estimated project cost based on similar project (Paleisheuwel). Investment details are not available yet. |
Original sector | Energy |
Budget |
Location
Country | South Africa |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Solar, Power Transmission, Wind, Raw Materials, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-09-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
