Adani Green Khavda Battery Energy Storage System (BESS) Plant
Sector: Energy Storage • Location: Khavda, Gujarat, India
Source: Whalesbook
Adani Green Energy Limited (AGEL) has operationalized a 3.37 GWh Battery Energy Storage System facility at the Khavda renewable energy complex in Gujarat. The project was completed in 10 months and is the largest BESS project outside China by location. It aims to stabilize renewable energy supply by integrating generation and storage to manage grid load and support merchant and Round-the-Clock pow
- Status
- Closed
- Sector
- Energy Storage, Power Generation (CCGT)
- Location
- Khavda, Gujarat, India
- Updated
- 22 Jul 2026
- Source
- Whalesbook
ConstructChat
Ask ConstructChat about Adani Green Khavda Battery Energy Storage System (BESS) Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Adani Green Energy Limited (AGEL) has operationalized a 3.37 GWh Battery Energy Storage System facility at the Khavda renewable energy complex in Gujarat. The project was completed in 10 months and is the largest BESS project outside China by location. It aims to stabilize renewable energy supply by integrating generation and storage to manage grid load and support merchant and Round-the-Clock power markets. |
Original sector | Energy |
Location
Country | India |
State | Gujarat |
City | Khavda |
Source
Source | Whalesbook |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Power Generation (CCGT) |
Article published date | 2026-05-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
