ADANI POWER LIMITED RAIGARH EXPANSION PROJECT 2X800 MW ultra supercritical Coal Based Thermal power plant
Sector: Geothermal • Location: Raigarh, Chhattisgarh, India
Source: India Investment Grid (IIG)
Information Adani power limited is coming up with RAIGARH EXPANSION PROJECT 2X800 MW ultra supercritical Coal Based Thermal power plant with a ticket size of 13600 INR Crores. This project in Energy Generation [Non-Renewable] sub-sector involves power generation through coal based Thermal power . The current status of the project is in conceptualization stage. Economic/Social Impact of the P
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | not applicable |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Information Adani power limited is coming up with RAIGARH EXPANSION PROJECT 2X800 MW ultra supercritical Coal Based Thermal power plant with a ticket size of 13600 INR Crores. This project in Energy Generation [Non-Renewable] sub-sector involves power generation through coal based Thermal power . The current status of the project is in conceptualization stage. Economic/Social Impact of the Project Adani power Limited is operating 1x600 MW coal based thermal power plant at Raigarh . The plant is located at a distance of 35 Km from Raigarh City. The coal will be supplied from the nearby mines of SECL. The water requirement for the plant will be fulfilled through from the KALMA Barrage on Mahanadi River. Two units of 800 MW turbine generator sets fed by steam from coal fired P.F. boiler operating at Ultra Super-critical range.. Cooling System Closed recirculating condenser cooling system with induced draft cooling tower. Coal Handling System-Coal handling facility, which comprises receipt of coal through Rail / Road, with on-line crushing and stacking by stacker-cum-reclaimer in the coal yard and finally feeding the bunker level conveyors. Ash Disposal System Provision will be made for collection of fly ash in dry form in silos for further utilization/transportation through rail wagons / closed trucks to adjacent Cement Plants / through open tucks in conditioned form for low lying area filling. Provision will be made for disposal of un-utilized ash in high concentration slurry form to ash dyke. Power Evacuation-At 400 kV level to State Transmission Unit STU. Environmental Aspects-Elaborate arrangements for Flue gas desulphurization FGD and Selective Catalytic Reduction SCR systems complying with emission norms as per latest MoEF & CC. Independent steel wet flue for each unit, down- stream of FGD of suitable height as per MoEF & CC guidelines and an adequately designed electrostatic precipitator with more than 99.99 efficiency are envisaged. Waste water quality to be maintained as per MoEF & CC notification. Zero Plant Discharge facility shall be present since the cooling water, blow down water, waste water and ash water would be recycled back to the system after suitable treatment for reuse. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |